MUSEUM OF NEW ZEALAND, TE PAPA

Prior to joining Peck Consultants, Keith Nightingale was responsible for the contract management of 8 separate contracts totalling over $M80 in the construction of the new museum. The role commenced during the concept development phase and required control of the consultants and contractors through to project completion.

Te Papa


© 2001 Peck Consultants
Design by Opus Web Design